news

Home ~ Archive by category "news"

Angler Expands Interiors with New McLane Global Project

Together with CDI Architects and Patrick Rolllins at CBRE, Angler is currently working on McLane Global, a 157,658 sq ft. corporate build out including high end office finishes and high pile storage facility project. Our Interior projects are in demand and expanding, so Angler is very excited to be realizing this one.

Angler Doubles it’s projects for the National Retail Chain Family Dollar

Angler is looking forward to constructing six more retail locations for Family Dollar. The new stores are located at MLK, Mesa-Tidwell, Fondren, Imperial Valley, West Gulf Bank and Aldine Mail Route. This will make twelve projects that Angler has built for the national retail chain.

Angler Awarded DHL’s 3rd Distribution Facility Building in La Porte, TX

DHL is expanding in LaPorte with a 3rd Distribution building at the La Porte campus.

DCT Industrial awarded the job to Angler Construction and was featured by several publications:

DCT® Featured on Commercial Property Executive: DHL to Expand Port of Houston Industrial Campus

DCT Industrial Trust to Develop 220,000 SF Distribution Center Near Port Houston

DCT® Featured on 4-traders: DHL to expand Port of Houston facility

DCT® Featured on Houston Chronicle: DHL to expand Port of Houston facility

Building Up Houston – Angler Gives their Best to the Community

In an ongoing effort to give back to the community, Angler contacted HomeAid Houston to find a project that needed assistance.  HomeAid Houston sugggested Agape Development’s transitional housing that was in need of driveways for both their girls home and new boys home in the Third Ward.  We are so proud to be able to help out our neighbors and look forward to doing it again!

Angler Breaks Ground at 927 Studewood

Together with owner 927 Stude, LLC and developer Chris Dray, Angler is looking forward to building this 3 story, structural steel and brick veneer mixed use location with office space and retail anticipating a ground level neighborhood cafe.

Second Regions Bank Completed in Lufkin, TX

Congratulations to Regions Bank and our team for a job well done in Lufkin, TX!!! A demolition/ground up banking facility of approximately 5,000 sq ft. The project duration was reduced from 180 days down to 102 as well as needing to overcome a major issue of removing 9 ft soils at the building pad on a very tight site in downtown Lufkin. Once complete, our build time for this branch was 89 days including demolition. We turned the project over December 1, 2016.

Angler Completes Prologis Facility

DCIM100MEDIADJI_0055.JPG

Together with owner Prologis and Powers Brown Architecture, Angler Construction completes this one story shell warehouse building designed to accommodate future high pile storage.  Greens Parkway is a 213,218 SF concrete tilt-wall cross-dock facility with typical column spacing of 45′ x 52′ with an ESFR sprinkler system located on the North side of Houston.  Completed in March of 2016, Angler was able to complete this project on budget.