Industrial Project Galleries

IDI North Houston Logistics Center

Completed in only 10 months (Feb. 2020), Angler delivered this 351,400 SF Tiltwall building and 3071 SF Speculative Office Buildout with Ductilcrete Heidebed Floor Slab System for owners IDI Logistics, LLC.
Architect: MacGregor Architects

South East Crossing Distribution Center

A 133,000 SF Tilt Wall distribution center in Pasadena, Texas. Project completed in 6 months for Vigavi Realty.

Architect: Seeberger

Barker Cypress Distribution Building

142,000 SF Distribution Building located on Highway 290 in Cypress, Texas. The Distribution building was completed in 7 months for Molto Properties.

Architect: Seeberger Architecture

Stafford Road Distribution Center

133,000 SF Distribution Center built for Vigavi Realty in 6 months.

Architect: Seeberger

 

Sugarland Crossroads

Two tilt wall warehouses totaling 327,000 SF – Completed in 10 Months for Transwestern.

Architect: Method Architecture

Reynolds 01

Reynolds Electric

Angler Construction has completed a 130,400 sq. ft. Office and Warehouse tilt-wall facility at Pinto Business Park in Houston, Tx, on the North Sam Houston Tollway near I-45 North.

Tyndale

A 74k sq ft. demised warehouse and office buildout completed in October 2018.   Owned by Tyndale USA.
Architect: Mills Architects

 

Conn’s HomePlus Houston Distribution Center

A 656,000 sq ft. warehouse (582k) and office build out (75k) completed in June 2019.   Owned by Liberty Property Trust.
Architect: Powers Brown

 

IDI West Little York

A 135,188 sq ft. industrial shell with Houston’s first Heidebed Ductilecrete floor slab system.  Completed February 2019. Owned by IDI Logistics, LLC.
Architect: MacGregor Architects

Ladish Valves

A 35,473 sq ft. warehouse with office space located on Bluff Point Dr.  Completed August 2018. Owned by Sbarcare Nostro, Ltd.
Architect: Munson Kennedy Partnership

Visual Comfort

September 2020 brought completion of this 128,000 sf expansion of the Visual Comfort Headquarters in Cypress, TX.
Architect: Powers Brown Architecture

BNLC I

Completed September 2019, the 102,863 sq. ft. warehouse is located in Bayport Industrial Park. By Triten Real Estate Partners.
Architect: Method Architecture

 

BNLC II

Located in Pasadena, the 233,190 sq. ft. cross-dock industrial warehouse includes structural steel and roofing. Completed October 2019 and owned by Triten Real Estate Partners.
Architect: Method Architecture

Richey Road

Over 156,000 sq ft. tiltwall warehouse with office space completed ahead of schedule December 2019 for Liberty Property Trust.
Architect: Powers Brown Architecture

 

JAE Electronics

A 10,300 sq ft. manufacturing facility and office expansion completed in August 2020.
Architect: HSPartners

 

DCT Excel LaPorte

A 220, 000 sq. ft. Distribution Center in La Porte, TX. Completed June 2017. Owned by Exeter Property Group.
Architect: Munson Kennedy Partnership

Department of Public Safety

This 23,862 sq. ft. DPS MegaCenter was completed in March 2018. It is located on State Highway 3 and owned by DPS South Houston 2000, LLC.
Architect: Barry Bubis Architects

Department of Public Safety- Angleton

This DPS in Angleton was completed in October of 2020. Owned by Develpment 2000 Inc., this is our second location completed for the state and team.
Architect: Barry Bubis Architects

 

 Greens Parkway

Together with owner Prologis and Powers Brown Architecture, Angler Construction completes this one story shell warehouse building designed to accommodate future high pile storage.  Greens Parkway is a 213,218 SF concrete tilt-wall cross-dock facility with typical column spacing of 45′ x 52′ with an ESFR sprinkler system located on the North side of Houston.  Completed in March of 2016, Angler was able to complete this project on budget.

Airtex II

Angler Construction has recently completed the shell construction for DCT Airtex II, a 126,000 SF light industrial speculative facility. The facility offers excellent access and direct freeway visibility along Interstate 45 at Airtex Drive in North Houston.
Architect: Munson Kennedy

Intrepid

Angler Construction was contracted to construct a 86,000 sf institutional quality tilt wall facility for Triten Real Estate.
Architect: Three Square Design

Rampart 1

131,200 sq. ft. structural tilt wall facility. 28’ clear Class A Structural Steel System with stacked storefront assemblies at entries, 60mil TPO roof system, expansive truck court, lift stations on detention pond and sanitary lines.
Architect: Powers Brown Architecture

Rampart 2

305,000 sq. ft. structural tilt wall facility. 32’ clear Class A Structural Steel System with aluminum canopies at entries. 60mil TPO roof system, 4000 amp underground power to facility.
Architect: Powers Brown Architecture

Rampart 3

Building 3 of Rampart Corporate Center is a 132,470 square foot institutional quality tilt wall building, completed in 6 months.
Architect: Powers Brown Architecture

T&L Distributing Design & Build

121,025 sq. ft. building footprint, 28’ clear Class A Structural Steel System with elevator, curtain wall glazing assembly at entry, insulated glass at all windows, dock packages, high pile compliant design and implementation.
Architect: Powers Brown Architecture

Parker Design & Build

60,000 sq. ft. Design Build project. 5-ton crane, 30,000 sq ft of conditioned space with specialty flooring, 20,000 sq ft of distribution area and 10,000 sq ft of office space, computerized HVAC system with VAV controls.
Architect: Three Square Design Group

FedEx

Angler Construction has completed interior build-out of a specialized secure area for FedEx.