- Industrial Projects
- Reynolds Electric
- Tyndale
- Conn’s HomePlus Houston Distribution Center
- IDI West Little York
- IDI North Houston Logistics Center
- Ladish Valves
- BNLC I
- BNLC II
- Richey Road
- DCT Excel LaPorte
- Department of Public Safety Mega Center- South Houston
- Greens Parkway
- Airtex II
- Intrepid
- Rampart
- T&L Distributing
- Parker
- FedEx
Gary Frick
General Manager, Hartwig
Rampart 1
131,200 sq. ft. structural tilt wall facility. 28’ clear Class A Structural Steel System with stacked storefront assemblies at entries, 60mil TPO roof system, expansive truck court, lift stations on detention pond and sanitary lines.
Architect: Powers Brown Architecture
Rampart 2
305,000 sq. ft. structural tilt wall facility. 32’ clear Class A Structural Steel System with aluminum canopies at entries. 60mil TPO roof system, 4000 amp underground power to facility.
Architect: Powers Brown Architecture
Rampart Corporate Center 3
Building 3 of Rampart Corporate Center is a 132,470 square foot institutional quality tilt wall building. Completed in 6 months, it is the third building that Angler Construction has completed in Rampart Corporate Center in less than 18 months. The building boasts 32’ clear with a 3000 amp electrical service.
Architect: Powers Brown Architecture