2000 Bering Conference Center

Completed in  February 2020, Angler shows off this conference center at 2000 Bering and its unique louvered ceiling design for Tanglewood Properties.
Architect: Inventure Designs

Greenway Plaza Conference Center

Completed in October 2018 and located at 8 Greenway Plaza, Angler built out this stunning 2,580 sf conference center with special features including MDC Zintra acoustical ceiling panels for Parkway Properties.
Architect: Ziegler Cooper

5847 San Felipe Ste 1925

A 4,659 sq. ft. interior office build located in San Felipe Plaza and completed August 2018. Owned by Parkway Properties.
Architect: Ziegler Cooper

Legacy at Fallbrook Amenity Center

Completed in October 2019, this 6,175 sq. ft. interior finish-out includes a conference room, fitness room and eatery. By Exeter Property Group.
Architect: Powers Brown Architecture

Essentra at 8819 Fallbrook

Completed in July 2019, Angler shows off this versatile office design for Liberty Property Trust.  Including manufacturing space, office, conference, kitchen and breakroom, as well as call center and training space.
Architect: Powers Brown Architecture

PCUbed

Completed in April 2020, Angler shows off this sharp looking office space for Hines Properties.

Architect: The Wingfield Sears Group

Lonquist & Co.

Completed in April 2020.

Architect: Goree Architects

Diamond Offshore

Angler has completed construction on the interior build out for Diamond Offshore’s Learning and Development Center. This 15,000 sqft corporate interiors project was designed by Architects Plus. Unique finishes were incorporated throughout the building.
Architect: Architects Plus

Remedi Senior Care

Completed this sharp looking interiors project April of 2019. 38,721 sq ft of manufacturing space build out.

Architect: Munson Kennedy Partnership 

Startex

Angler has completed a 11,250 sq. ft. corporate interior project for Startex. The project, which features a 12’ ceiling height throughout and an abundance of specialty millwork and flooring, was completed in 45 days.
Architect: Lamoureux & Associates, Inc.

Briarpark Spec Space

The 2,504 sq. ft. spec space was completed February 2019. Owned by Triten Real Estate Partners.
Architect: Lamoureux Associates, Inc.

Hydraquip

This 80,000 sf corporate finish out project was Angler Construction’s second for Hydroquip and Liberty Property Trust.

EOHI

11,250 sq. ft. corporate interior project. 12’ ceiling height, specialty millwork and flooring. Project completed in 45 days.
Architect: Seeberger & Associates

CellTex

15,000 sq. ft. interior finish out project. Offices, Laboratory and Class I
Clean Room, special epoxy flooring and wall systems.
Architect: Powers Brown Architecture

Texas Tissue

Angler Construction has completed a 144,000 sq. ft. manufacturing facility for rolled paper goods in northeast Houston. This build-out was heavy in electric and used for freight distribution.

DHL Build Out

In July 2017, Angler Construction completed the interior build out for DHL with Cushman & Wakeman.